![]() |
MACHINING TIMES |
![]() |
||||
| Zone : d:\workzones\parkerward\pumpe\ |
| Generated : Dec 01 14:01:17 | Programmer : Chris Parker | Project : spt- |
| Comments : |
| Surface File: pumpe.wnc | Stock allowance : 0.000 |
| Path | NC File | Type of Machining | Driven point | Rapid | Time in Rapid | Cut | Time in Cut | ||
| 1 | spt-01.h | High-Feed Roughing | Tip | 3569.5 mm | .446 Min. | 27626.5 mm | 11.290 Min. | ||
| 2 | spt-02.h | Contour Re-Roughing | Tip | 4108.6 mm | .514 Min. | 4402.5 mm | 1.711 Min. | ||
| 3 | spt-03.h | Z-level finishing | Tip | 268.6 mm | .034 Min. | 18812.8 mm | 6.396 Min. | ||
| 4 | spt-04.h | Optimized Z-level finishing | Tip | 879.2 mm | .110 Min. | 26045.3 mm | 9.058 Min. | ||
| 5 | spt-05.h | Contour remachining | Tip | 896.6 mm | .112 Min. | 14029.3 mm | 4.764 Min. | ||
| 6 | spt-06.h | Z-level finishing | Tip | 387.2 mm | .048 Min. | 26234.3 mm | 8.887 Min. | ||
| 7 | spt-07.h | Optimized Z-level finishing | Tip | 892.1 mm | .112 Min. | 36096.5 mm | 12.492 Min. | ||
| 8 | spt-08.h | Contour remachining | Tip | 944.8 mm | .118 Min. | 14077.6 mm | 4.788 Min. | ||
| 9 | spt-09.h | Contour remachining | Tip | 847.6 mm | .106 Min. | 12052.7 mm | 4.110 Min. | ||
| Cumulated time | |||||||||
| Total rapid : | 1.60 Min. | ||||||||
| Total cut : | 63.50 Min. | ||||||||
| Total times 1 Hour(s) and 3 Minute(s) | |||||||||